allied waste, aw, republic services, rsg waste management, wm, capital environmental resources ceri, waste services, wsi, bfi, browning ferris industries, rfp contract, terminable at will without penalty, roll overcontract, terminable at will without penalty, roll over rollover, roll-over, evergreen, auto-renewing autorenewing, contract, service agreement, front load, front end load roll off, garbage truck, omega, computerized waste consolidated, consolidated billing, waste billing, manage waste reduce waste expenditures, facility management, share savings compactor, trash compactor, baler, FEL, cardboard recycling, recycle garbage equipment, waste reduction, waste brokers, trash, waste management services, Oakleaf, garbage containers, waste watch OCC, wood, metal, plastic, tires, office fiber recovery, tons, newspaper, corrugated containers, office paper glass containers, pallets, plastics, yard waste, contaminants, waste stream, material density factors baled, loose, stacked, compacted, semi-crushed, crushed, flattened, commercial collection commercial recycling, debris, service levels, Independent Waste Consultants, dumpsters,  IWC
environment, environmental, franchise, franchise city, waste management, efficiency, efficient, hauler
    Case Study #1
 

Electronics Retailer

An electronics retailer with locations throughout Florida and Arizona hired WP to consult
on potential savings for waste services it managed in-house at its corporate location. WP
identified several areas:
  • Price negotiations for existing service

  • Change of equipment specifications

  • Alteration of collection schedules

  • Implementation of recycling programs

  • Elimination of waste hauler agreements with rollover clauses.

After completing a review and database of all location information, new prices with existing vendors were negotiated. A waste characterization developed by WP concluded that sites could easily recycle more than half their waste, resulting in additional savings.
Classifications of savings:

  • Gross waste cost cut by 57%.

  • Hauler contracts eliminated at 92% of locations after first year, 100% in second year.

  • No cancellation fees paid to eliminate hauler contracts.

  • Total gross savings for first year alone: $459,000.00.

Next Case

 

 
Copyright© 2008 Waste Professionals • All Rights Reserved
237 S. Westmonte Drive, Suite 305
Altamonte Springs, Florida 32714
Toll Free (877) 404-4081 • Office (407) 478-8800 • Fax (407) 478-8801